A non-standard installation consists of anything beyond the
standard installation. The table below lists the additional charges
for some of the more common non-standard installation items or
activities. For any non-standard item or activity not found in the
table below, the installer will provide a quote and will not proceed
without your authorization. All charges are due and payable directly
to the installer at the time the work is performed. |
|
Non-Standard Installation and Maintenance Items |
Price |
|
Additional Point of Entry beyond the one included in Standard
Installation |
N/A |
|
Additional cable (beyond 2) <= 75 feet |
Dual RG-6 .50 ft. |
|
Additional cable over 75 feet (includes materials) |
$0.50/foot |
|
Conduit material and installation, will be used when cables
are to be ran underground from pole to structure |
$ 5.25/foot |
|
Night Rates after 5:00pm if part of same day service |
$75 per hour |
|
Labor rate for misc. non-standard labor activities (in addition to
Additional Site Visit charge below if installer is unable to perform
additional labor at time of original installation due to
unavailability of non-standard materials or due to conflicts with
previously-scheduled installations) |
$60/hr: Bus
$75/hr: Eves & Sat.
$125/hr: Holidays or Other |
|
Trip charge fee if required or requested for non-standard items |
See trip charges blow |
|
Pole mounts are required for slate and terracotta roofs. Also, pole
mounts must be installed at a minimum of 5 feet tall
A 5 or 7 foot Pole Mount installation includes material and up to 15'
of cable trenching (trenching greater than 15' is $5.25 per foot
including materials) |
$125.00
All cables buried in conduit from pole to structure |
|
Wall or roof mounts on stucco homes may require additional charges
|
We do not mount to stucco |
|
Roofs with a slope greater than 40 degrees or higher than a standard
two story house may require additional time, safety equipment or
additional staff to assist in the installation |
TBD |
|
Aborted visit for customer-caused reasons |
$50 + trip charge |
|
Fishing cables - running cable behind interior walls; simple drop
|
Included |
|
Indoor equipment relocation using existing cables |
Hourly + Materials |
|
Material rate for miscellaneous non-standard materials |
Retail pricing |
* Bus:
9:00 AM - 5:00 PM (M- F site local time, excluding banking holidays)
* Eve: 5:00 PM - 8:00 PM (M - F site local time, excluding banking
holidays)
* Sat: 9:00 AM - 2:00 PM (Saturday only site local time)
* Other: All other times and all-day holidays, including New Year's
Day, President's Day, Martin Luther King Day, Memorial Day, Fourth of
July, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.
|
|
Mileage-based trip charges |
|
|
Distance to customer premise |
|
|
0-30 miles
(Pending road conditions) |
no trip charge |
|
31-100 miles |
$60.00 per hour starts |
|
101-200 miles |
see above |
|
200+ miles |
see above |
|
We know that most of the folks past
Ashfork and Seligman will not apply to Map Quest because your physical
location is in "the boonies". However, from Chino, Trip
charges start at Bullock Rd. in Ash Fork to the point of arrival.
See above for our rate. At this time, it
is only charged one way. |
| |
|
|
Outdoor
equipment relocations after initial installation |
Relocate antenna on different property:
Deinstallation of StarBand system
Reinstallation of StarBand system with new cables and same antenna
roof/wall mount |
Hourly plus materials |
Relocate antenna on same property:
Deinstallation of StarBand system
Reinstallation of StarBand system (performed at same visit as
deinstallation) with new cables and same antenna mount |
Hourly plus materials |